NHAI PIU-Jammu Jammu - Kathuwa
Jammu - Kathuwa From Sep-2020 12-Lanes, 1-Plaza, HETC
Skylark Ltd. karve-Analone (Assam)
karve-Analone (Assam) From Oct-2021 8-Lanes, HETC, WIM
Jitendra Singh infrastructure P Ltd Itarsi – Betul Section on NH-69
10 Lane TMS Itarsi – Betul Section on NH-69
Rahul Mishra Contractor Huliyar Toll Plaza
Huliyar Toll Plaza. Details 8-Lane TMS
Soft Logic. Banglore. (Running Project)
Banglore. (Running Project) 8-Lane TMS
Sadguru Engineer & Allied Service P Ltd Jorhat (Running Project)
Jorhat (Running Project) 8-Lane TMS
B R Goyal
Dhule (MH) (Running Project) 8-Lane TMS
Barfani Developer). Punjab
From April-2018 to Till Now, (AMC)
Intelliro Infratech Pvt. Ltd. Dimapur-Kohima NHAI
From Nov 2020 to Till Now(AMC) 8-Lane HETC, WIM
Descon Infra Ltd
Technovaa has successfully implemented at Barhima Toll NHAI Duration: From April-2021 8-Lane-Highway Electrification, Canopy
Alam Enterprise & Brothers
Technovaa has successfully implemented at Kagaria Toll Plaza NH-333B, Nov-2023 Details: 8-Lanes-Highway & Plaza Electrification, Canopy High Mast
CUBE HIGHWAYS – DISTANCE-BASED TOLLING PROJECT | 7 TOLL PLAZAS | 56 LANES
Technovaa Software & Hardware Solutions Pvt. Ltd. has successfully implemented one of its largest and most significant Toll Management System (TMS) projects for Cube Highways.
The project comprises 7 toll plazas with a total of 56 operational lanes and is based on an advanced distance-based tolling system.
13-Plaza 152 Lane IHMCL O&M
This project is Completed through O&M tender for 13 toll plaza is awarded to Us by IHMCL at 21 june 2022, Toll plaza is successfully implemented with ETC system by our organization . Including Plaza Name- Bhavdin, Landhari, Manderdisa, Nazirakhet, Mikirati, Sukhapada, Padmanvapur, Bolangir, Palyagandvakattu, Shenbegampettai, Pokhria, Sonho
18 Plaza, 192 lane IHMCL Project
This project is Completed through O&M tender for 18 toll plaza is awarded to Us by IHMCL at 2 April 2024, Toll plaza is successfully implemented with ETC system by our organization . Including Plaza Name- Bhavdin, Landhari, Pokhria, Sonho, IDTL A - IDTL -B, Usma Toll Plaza, Lehrbagga Toll Plaza, chakbamniya TOll plaza, Bor Charnan , Doli Toll Plaza, Hathitala Toll Plaza , Umared Toll Plaza, Wadgoan toll Plaza, Munnanur Toll Plaza, Bannajodi Plaza, Hasanpur toll plaza, Khantaghar Plaza
,
19 Plaza 196 Lane IHMCL Project
This project is Completed through O&M tender for 19 toll plaza is awarded to Us by IHMCL at 04-Feb-2024, Toll plaza is successfully implemented with ETC system by our organization . Including Plaza Name-
5 Plaza 32 Lane IHMCL Project
This project is Completed through O&M tender for 5 toll plaza is awarded to Us by IHMCL at 28-june-2023, Toll plaza is successfully implemented with ETC system by our organization . Including Plaza Name- PRAYAGRAJ bypass
Tata Projects
This project BOT Adityapur Toll bridge, Jamshedpur, From April 2019 to Till Now, 8-Lane HETC, with ANPR integration Toll plaza is successfully implemented with ETC system by our organization .
Madhucon Projects
This project BOT Madhurai-Tuticorn , Madhurai-Tuticorn 8-Lane HETC, 20-Lanes, 2-Plaza, TMS, Integration with Existing integration Toll plaza is successfully implemented with ETC system by our organization .ion .
H.G. Infra Engineering Limited
This project BOT Jaipur – Gumanpur Toll Plaza From Oct-2018 to Till Now , 8-Lane HETC, integration Toll plaza is successfully implemented with ETC system by our organization .
Essel infra–Projects Ltd.
This project BOT Labad-Badnawar-Ratlam Toll Plaza From Oct-2012 to Nov-2017 20-Lanes, 2-Plaza TMS , integration Toll plaza is successfully implemented with ETC system by our organization .
Balaji Tollways Ltd.
This project BOT Madhurai Ring Road Toll Plaza From Oct-2018 Till Now , 30-Lanes, 3-Plaza HETC, with integration of connected Toll Plaza, integration Toll plaza is successfully implemented with ETC system by our organization .
Topworth Tollways Ltd
This project BOT Ujjain – Nagod Toll Plaza Details: 12-Lanes, 2-Plaza HETC, integration Toll plaza is successfully implemented with ETC system by our organization .
Sukla Construction
This project BOT Badwani Toll Plaza Details: 18-Lanes, 3-Plaza HETC, From Jan 2019 integration Toll plaza is successfully implemented with ETC system by our organization .
MBL Infrastructure Ltd.
This project BOT Balaghat (M.P) Toll Plaza Details: 6-Lanes, 1-Plaza, TMS HETC, From Aug-2015 to Nov-2019 integration Toll plaza is successfully implemented with ETC system by our organization .
DS Infracon & Technology
The project is going on under the state of Maharastra at Kusumba -Malegaon Toll Plaza. This plaza is successfully implemented with Hybrid ETC system by our organization .
NHAI (UNDER PIU-KOTA)
The project is going on under the NH-27 under PIU-KOTA in the state of Rajasthan . This plaza is successfully implemented with Hybrid ETC system by our organization .
NHAI PROJECT (UNDER DAUSA PIU)
The project is going on under the NH-11B under PIU-Dausa in the state of Rajasthan . This plaza is successfully implemented with Hybrid ETC system by our organization .
VKSCPL UDAYPURA SILWANI CORRIDOR PRIVATE LIMITED
The project is going on under the M.P.R.D.C . This is taken by VKSCPL Udaypura Silwani CORRIDOR PRIVATE LIMITED.Our organization successfully installed the 2 toll plaza BETWEEN Udaypura - Silwani operational software with all hardware & software with all facilities such that IR based AVCC sensor,automatic barrigate control,automatic image capturing , automatic short time video recording for every transactions
Dilip Buildcon Ltd
Develop & Install Hybride ETC & AVCC & TMS on 16 lane at chillachond & kondar toll plaza from karoli to dholpur . under NHAI. Project installed at both sites including of Hybride ETC & AVCC & TMS Integration, Software & Hardware Devices, Hardware include Hybride ETC , AVCC sensor, Barrigate, Fare-Display, Traffic Light, Barcode, Smart card etc
DBL Ashoknagar - Vidisha Tollways Ltd
The project is going on under the M.P.R.D.C . This is taken by DBL Ashoknagar - Vidisha Tollways Ltd.Our organization successfully installed the toll plaza operational software with all hardware & software with all facilities such that IR based AVCC sensor,automatic barrigate control,automatic image capturing , automatic short time video recording for every transactions.
Madurai - Theni (Lexus Computers)
The project is going on under the NHAI. This is taken by Lexus Computers .Our organization successfully installed the 2 toll plaza operational software between madurai - theni with all hardware & software with all facilities such that IR based AVCC sensor,automatic barrigate control,automatic image capturing , automatic short time video recording for every transactions
Madurai-Rameshwaram
The project is going on under the NHAI. This is taken by Shivani Infotec.Our organization successfully installed the toll plaza operational software with all hardware & software with all facilities such that IR based AVCC sensor,automatic barrigate control,automatic image capturing , automatic short time video recording for every transactions.
DBL Uchera Nagod Tollways Ltd
The project is going on under the M.P.R.D.C . This is taken by DBL Uchera Nagod Tollways Ltd.Our organization successfully installed the toll plaza operational software with all hardware & software with all facilities such that IR based AVCC sensor,automatic barrigate control,automatic image capturing , automatic short time video recording for every transactions.
Madhucon Projects Ltd.
Develop & Install TMS & WIM Integration system at Madhurai-Tuticorin toll including of 2-Plaza-24-Lanes, under NHAI. Project installed at both sites including of WIM & TMS Integration, Software & Hardware Devices, Maintain AMC Including of all reporting system, pass. Hardware include AVCC sensor, Barrigate, Fare-Display, Traffic Light, Barcode, Smart card etc.
Madhucon Projects ltd.
Develop & Install WIM Integration system at Majeeda-Bharatput toll including of 2-Plaza-20-Lanes, under NHAI. Project installed for WIM integration including of Software & Hardware Devices, Maintain Separate Database Structure for WIM Extra Amt.
SKYLARK SECURITAS LTD
6-Lane Plaza system Install at Purnia Toll Plaza Bihar under NHAI. TMS software Install including of all Hardware & Software, All devices manage according to the software with the existing hardware.
SKYLARK SECURITAS LTD
Technovaa Successfully install 6-Lane System, project location - Porbandan (Gujrat) under NHAi. Installation of software & Hardware devices Including of TMS Software, Lane Monitoring System, Automatic Barrigate.
RIDCOR (Jhalawad-M.P Border)
Technovaa Install 4-Lane system including of all Hardware & Software at Jhalawad-M.P Border. Installation of TMS for Booth operation including of Transaction Image camera, control panel, Automatic Barrigate system, AVCC. Plaza Installation including of Database server and Audit system, online Auditing, Automatic back-up System. Undertaken by RIDCOR Project.
Eagle Deep Infra India Pvt. Ltd.
Technovaa Install 2-Lane system including of all Hardware & Software at Petlabad By-pass-Jhabua (M.P). Installation of TMS for Booth operation including of Transaction Image camera, control panel, Automatic Barrigate system, AVCC. Plaza Installation including of Database server and Audit system, online Auditing, Automatic back-up System. Undertaken by MPRDC Project.
PBH Engineering & Construction Pvt. Ltd.
Technovaa Install 6-Lane system including of all Hardware & Software at Shillong By-pass-Meghalaya. Installation of TMS for Booth operation including of Transaction Image camera, control panel, Automatic Barrigate system. Plaza Installation including of Database server and Audit system, online Auditing, Automatic back-up System. Undertaken by NHAI Project.
SARAIWALA AGRR. OIL REFINERIES LTD. (HYDERABAD )
Devlop Software & Installation for Industry Vehicle IN-OUT Entry Database, System develop with Hardware simulation CCTV Camera, Automatic Barrigate System, Total computerized Operational System All the Transaction IN-OUT with the Images.
L&T IDPL (RAJKOT-JAMNAGAR)VADINAR LOCATION
Develop & Install TMS & WIM Integration system including of 2-Plaza-24-Lanes, under NHAI. Project installed at both sites including of WIM & TMS Integration, Software & Hardware Devices, Maintain AMC Including of all reporting system, pass. Hardware include AVCC sensor, Barrigate, Fare-Display, Traffic Light, Barcode, Smart card etc.
GAYTRI PROJECTS LTD.[IDTL] (INDORE-DEWAS)
Installation of ETM machine for (TOLL manual Operational System), Installation of ETM Software for simulation of ETM Machine with Data Transfer Facility. Installation of On-Line UPS for all Booths.
VALECHA LM TOLL ROAD PVT.LTD. (LABED - MANPUR PROJECTS )
Installation of ETM machine for (TOLL manual Operational System), Installation of ETM Software for simulation of ETM Machine with Data Transfer Facility.
ESSEL BINA - KIMLASA, SAGAR - DAMOH I, II SECTION TOLL ROAD LTD. (ESSEL INFRA PROJECTS LTD.)
Installation of IR & Online Camera with DVR System, Installation of Toll System & Accessories for Two section Sagar & Bina. Installation of ETM machine for (TOLL Mannual Operational System), Installation of ETM Software for simulation of ETM Machine with Data Transfer Facility at both section Sagar & Bina.
AHMEDNAGAR - PUNE ROAD (SUPREME INFRA PROJECTS LTD.)
Supply of 50 Nos. Boom Arms Regarding of existing Barrigate System.
MBL INFRASTRUCTURE LTD.
Making & Installation of Boom Barrier at (Seoni-Balaghat Road).
MAHAKALESHWAR TOLLWAYS PVT. LTD.(INDORE-UJJAN ROAD)
Installation of the ETM (Electronic Ticket Machine) Machine, Developed & Installation of the Software for Manual Operation. Supply & Installation of CCTV & Online IR Camera with DVR System at I & II Each Section.
KHALGHAT TOLL WAYS LTD.
Installation of the ETM (Electronic Ticket Machine) Machine, Developed & Installation of the Software for Manual Operation. Supply of Thermal Paper roles for thermal printer
NATIONAL HIGHWAY-8 (PATH I LTD.).
10-Lanes Toll Plaza Operational Software Installation & Upgradation According to the rules of NHAI (Himmatnagar Road). Installation behalf of NH Authority.
AGROH INFRASTRUCTURE DEVELOPERS PVT. LTD.
Installation of Check post Ujjan-Jalawad Road Including of Server, Booth, CCTV, Control Panel. Installation of CCTV & Online IR Camera with DVR System .
BHIND-MEHONA-GOPALPUR (ESSEL INFRA PROJECTS LTD.)
Installation of CCTV & Online IR Camera with DVR System .
MARKANDY INTERNATIONAL LTD.(FIROZPUR-JALANADAR ROAD(S.H.))
installation and commissioning of 6 lane toll plaza operational software with all including hardware Server, CCTV, Control Panel, Loops, Barrigates, Sensors, Software & Hardware. Installation of CCTV & Online IR Camera with DVR System .
DBCL(DEWAS-BHOPAL TOLL)
Company Doing maintenance for 30-Lanes Toll Plaza Operational System Including of Server, CCTV, Control Panel, Loops, Sensors, Software & Hardware. Installation of vary focal Online IR Camera with DVR System for the purpose of vehicle number plate and vehicle image capturing .
GUNA INFRASTRUCTURE LTD.
Company Doing AMC for 10-Lanes Toll Plaza Operational System Including of Server, CCTV, Control Panel, Loops, Sensors, Software & Hardware. Installation of CCTV & Online IR Camera with DVR System .
JTCL PROJECTS PVT. LTD. (RATLAM-JAWORA-NAYAGOAN)
Supply & Installation of CCTV & Online IR Camera with DVR System at I, II & III Each Section. Supply & Installation of ETM Machine (manual Operational System) & Making of software for simulation with ETM Machine.
SKYLARCK LTD. (GORHAR - BARWADDA) NH-2
Installation of Toll Plaza Operational Software. Supply & Installation of ETM Machine (manual Operational System) & Making of software for simulation with ETM Machine.
PALLAVI CONSTRUCTION LTD.(15 LOCATION AT NANDED)& MALEGAON ROAD
The project is going on under the M.S.R.D.C Total 60 km road one sections. Our organization successfully installed the toll plaza operational software in the first section with all hardware & software. Our organization successfully installed the IR Camera Installation with DVR system, Also Including of On-Line Process to Corporate Office Through Network In Both Section. Supply & Installation of ETM Machine (manual Operational System) & Making of software for simulation with ETM Machine for all 15 locations at nanded city.Company Doing AMC for 16-Lanes Toll Plaza Operational System Including of Server, CCTV, Control Panel, Loops, Sensors, Software & Hardwares.
SKYLARCK LTD. (HIMMATNAGAR - AHEMEDABAD) NH-8
The project is going on under the NH-8 road . This is taken by skylarck Ltd.Our organization successfully installed the toll plaza operational software in the check-post section with all hardware & software with all facilities such that IR based AVCC sensor,automatic barrigate control,automatic image capturing and also installed online dvr for recording 24 hours .
U-TOLL LTD.(NH-2 ALLAHABAD BYPASS)& NAINI & ANANTRAM TOLL PLAZA
The project is going on under the NH Total 87 km road divided into five sections. Our organization successfully installed the toll plaza operational software in the first and Last section with all hardware & software. Our organization successfully installed the IR Camera Installation with DVR system, Also Including of On-Line Process to Corporate Office Through Network In Both Section. Supply & Installation of ETM Machine (manual Operational System) & Making of software for simulation with ETM Machine. Company Doing AMC for 16-Lanes Toll Plaza Operational System Including of Server, CCTV, Control Panel, Loops, Sensors, Software & Hardwares.
LEBAD - RATLAM FOUR LANE PROJECT. (WMPITRL) ESSEL INFRA PROJECTS LTD.
The project is going on under the M.P.R.D.C Total 125 km road divided into two sections. This is taken by Essel Infra projects Ltd. Our organization successfully installed the IR Camera Installation with DVR system, Also Including of On-Line Process to Corporate Office Through V-Sat In Both Section. Company Doing AMC at Badnawar for 10-Lanes Toll Plaza Operational System Including of Server, CCTV, Control Panel, Loops, Sensors, Software & Hardwares. Company Doing AMC at Ratlam for 09-Lanes Toll Plaza Operational System Including of Server, CCTV, Control Panel, Loops, Sensors, Software & Hardwares.
DEVAS - BHOPAL 10 LANE PROJECT. DBCL (WELSPUN)
The project is going on under the M.P.R.D.C. This is taken by DBCL(WELSPUN). Our organization successfully installed the IR Camera Installation with DVR system, Also Including of On-Line Process to Corporate Office Through V-Sat In Both Section. Company Doing AMC at Amlah for 10-Lanes Toll Plaza Operational System Including of Server, CCTV, Control Panel, Loops, Sensors, Software & Hardware's.
GHATABILLOD CHECK POST SIX LANE PROJECT. ESSEL INFRA PROJECTS LTD.
The project is going on under the M.P.R.D.C check-post road . This is taken by Essel Infra projects Ltd.Our organization successfully installed the toll plaza operational software in the First section with all hardware & software with all facilities such that IR based AVCC sensor,automatic barrigate control,automatic image capturing and also installed online dvr for recording 24 hours and Including of On-Line Process to Corporate Office Through V-Sat In Both Section.
JHANSI-POONCH SIX LANE PROJECT. SKYLARCK LTD.
The project is going on under the NH-25 road . This is taken by skylarck Ltd.Our organization successfully installed the toll plaza operational software in this sections
BAMANBORE - GARAMORE FOUR LANE PROJECT. SKYLARCK LTD
The project is going on under the NH-8A road . This is taken by skylarck Ltd.Our organization successfully installed the toll plaza operational software in this section.